HIGH-RISK ACTIVITY AUDITS
Munkoh Ltd examines the planning, competence, equipment, supervision and site controls behind higher-risk work, then turns the evidence into clear, prioritised management action.
01Planning, hierarchy of control, competence, access systems, MEWPs and rescue.


Suspended-load assurance covering LOLER, lift planning, lifting equipment, supervision and execution.
03Plant, vehicles, routes, reversing, deliveries, equipment condition and pedestrian segregation.


Lifting, carrying, pushing, pulling, loading, unloading, transfer, stacking, storage and mechanical aids.
05Design control, coordination, installation, loading, inspection and change management.
06Ground conditions, buried services, support, access, edge protection and competent inspection.
07Avoidance, entry controls, atmosphere, isolation, communications and rescue.
08Electrical, mechanical, hydraulic, pneumatic, pressure, thermal, gravity and stored-energy isolation.
09Stability, sequencing, services, temporary works, hazardous materials, plant and exclusion controls.
10Permits, ignition control, fire precautions, fire watch and emergency readiness.
11Authorisation, coordination, isolations, handback and simultaneous operations.
THE AUDIT METHOD
Scopes can address one critical activity or combine several connected interfaces across a project or operational site.
Confirm the activity, interfaces and applicable standards.
Review plans, competence, permits, inspections and records.
Observe work as done and test critical controls at the point of work.
Report material findings, priorities, ownership and close-out evidence.